{"id":404516,"date":"2026-08-06T12:44:07","date_gmt":"2026-08-06T10:44:07","guid":{"rendered":"https:\/\/kvernelandenergi.no\/roi-for-ev-charging-infrastructure\/"},"modified":"2026-11-19T15:49:47","modified_gmt":"2026-11-19T14:49:47","slug":"roi-for-ev-charging-infrastructure","status":"publish","type":"page","link":"https:\/\/kvernelandenergi.no\/en\/roi-for-ev-charging-infrastructure\/","title":{"rendered":"ROI for EV Charging Infrastructure"},"content":{"rendered":"<p>The profitability of commercial charging infrastructure in Norway is determined by four factors: capital expenditure (chargers, civil works, grid connection), the peak demand charge in the grid tariff, utilization rate, and the revenue or savings model (sale of charging, reduced fuel costs for own fleet, tenant value). Grid connection and demand tariffs are typically the greatest uncertainties\u2014not the chargers themselves.<\/p>\n<div>\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Cost\/revenue driver<\/th>\n<th scope=\"col\">Typical role<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Chargers (hardware)<\/td>\n<td>30\u201350% of CAPEX (typical)<\/td>\n<\/tr>\n<tr>\n<td>Civil works + grid connection<\/td>\n<td>30\u201360% of CAPEX, greatest variance<\/td>\n<\/tr>\n<tr>\n<td>Peak demand charge (grid tariff)<\/td>\n<td>Largest operational cost for DC fast charging<\/td>\n<\/tr>\n<tr>\n<td>Enova \/ municipal grants<\/td>\n<td>Can significantly alter the business case \u2013 check current programs<\/td>\n<\/tr>\n<tr>\n<td>Payback period for own fleet<\/td>\n<td>Driven by the diesel differential and operating hours<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The profitability of commercial charging infrastructure in Norway is determined by four factors: capital expenditure (chargers, civil works, grid connection), the peak demand charge in the grid tariff, utilization rate, and the revenue or savings model (sale of charging, reduced fuel costs for own fleet, tenant value). Grid connection and demand tariffs are typically the greatest uncertainties\u2014not the chargers themselves.<\/p>\n","protected":false},"author":6,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"dipi_cpt_category":[],"class_list":["post-404516","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/kvernelandenergi.no\/en\/wp-json\/wp\/v2\/pages\/404516","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kvernelandenergi.no\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kvernelandenergi.no\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kvernelandenergi.no\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/kvernelandenergi.no\/en\/wp-json\/wp\/v2\/comments?post=404516"}],"version-history":[{"count":0,"href":"https:\/\/kvernelandenergi.no\/en\/wp-json\/wp\/v2\/pages\/404516\/revisions"}],"wp:attachment":[{"href":"https:\/\/kvernelandenergi.no\/en\/wp-json\/wp\/v2\/media?parent=404516"}],"wp:term":[{"taxonomy":"dipi_cpt_category","embeddable":true,"href":"https:\/\/kvernelandenergi.no\/en\/wp-json\/wp\/v2\/dipi_cpt_category?post=404516"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}